    Two standards, one gap

    The largest SC Safe Home award — up to $7,500 for Resilient Mitigation — goes to a roof that meets two standards at once: the IBHS FORTIFIED Roof standard and SC Safe Home's own retrofit guidelines. For the most part they ask for the same things. SCDOI spells out the one place they differ: the programs are "based on the same nationally recognized mitigation standards, with the exception that the Safe Home program requires roof-to-wall connectors."

    That gap is easy to miss in an estimate — and expensive to discover after the award letter arrives.

    What a roof-to-wall connector does

    In a hurricane, wind flowing over a roof creates uplift: the roof wants to rise off the house. A FORTIFIED Roof keeps the deck fastened to the rafters or trusses and keeps water out. But the rafters and trusses themselves also have to stay fastened to the walls.

    In many older homes, that joint relies on a few nails driven at an angle. Roof-to-wall connectors — metal straps, clips or ties — tie each rafter or truss to the wall framing so the uplift load has a path down into the structure. The SC Safe Home statute lists roof-to-wall connections among the improvements the program funds.

    Where FORTIFIED fits

    IBHS builds its program in levels:

    • FORTIFIED Roof — the roof system: deck attachment, a sealed roof deck, edges, covering and flashing.
    • FORTIFIED Silver — adds protection for other vulnerable parts of the home, such as openings.
    • FORTIFIED Gold — adds a continuous load path, from the roof down to the foundation.

    Roof-to-wall connections are part of that load-path thinking, which is why a roof can earn a FORTIFIED Roof designation without them — and why SC Safe Home's Resilient award still asks for them.

    How to plan for it

    1. Ask for it by name. When you request a Resilient Mitigation estimate, ask the contractor to price SC Safe Home's roof-to-wall requirement as its own line, with the method and access it needs.
    2. Ask how it will be reached. Depending on the house, connectors may be installed from the attic or while the roof edge is open during the reroof. The method affects price and schedule.
    3. Check both credentials. Grant work goes through a contractor who participates in SC Safe Home; the roof itself must be installed by a FORTIFIED Wise roofing contractor for roofs permitted since November 1, 2025.
    4. Coordinate the documentation. The program's wind inspection covers SC Safe Home's requirements; your independent FORTIFIED evaluator documents the roof system for IBHS. Ask each what they need to see, and when, before work starts.
    5. Mind the clock. Approved work must be finished within three months of the Grant Award Notification letter, so a connector scope that needs extra carpentry belongs in the plan from day one.

    The Wind Pool notices it too

    If your wind coverage is with the SC Wind Pool, its mitigation notice lists a credit for roof tie-downs among its individual measures — one more reason to document the connectors when they go in. See SC Wind Pool vs SC Safe Home.

    Bottom line

    A Resilient Mitigation grant is a FORTIFIED roof plus SC Safe Home's roof-to-wall requirement. Price both, document both, and line up your evaluator before tear-off. Start with the SC Safe Home grant guide.